On Jan 30th 2014, some of the meter boxes (Units: 105,106,107,108) on building 10 will be replaced. During this time power will be turned off by CL&P.
On Jan 30th 2014, some of the meter boxes (Units: 105,106,107,108) on building 10 will be replaced. During this time power will be turned off by CL&P.